Railway bridge above the Danube river is lifted from barge with hydraulic system. Involving 32 jacks, PLC controlled synchronization. Simultanous control from PC.
Bridge launching
Troley for heavy power blocks
2007 Dunaújváros
2021 Szolnok
Welded steel bridge deck launching onto pillons. Up to 32 simultanous hidraulic actuators. Synchronised operation. Pushing speed 4 mm/sec. Continuous movement. PLC controlled pump units on each pillon.
Completed
Pentele bridge, Dunaújváros
Szebény viaduct, Szebény
Békéscsaba Railway bridge
M0 South on Danube, Budapest
Current
M4 motorway bridge on Tisza, Szolnok
fotó: Bernát Benjámin/magyarepitok.hu
Double carriage for the transport of heavy power geneartor units. Self propelled Max load 2x60t Height: 300 mm Hydraulic lifting 4 different modes of movement